For
the first eight years we did not have any building
of our own, we were residing in an open veranda
( front court yard of an building ). And this
open veranda was covered with blankets on the
sides as walls, there were no space to keep our
things meant for the children, there were no toilets
and bathrooms,the food for the children were prepared
in the open kitchen , during rainy season the
water used to stand till waist high and the children
could not go to school also, moreover it was difficult
to prepare the meals for the children. There were
few staff to look after the children. Then G.
V. teams started coming. and they cleaned an very
ruined building ( we rented one building near
the old place ). Plus they made toilet facilities,
water facilities,electricity etc,. for the children
in this building.
Before G.V. one of our friend
Dameion (INSA student) came here and send his
Professor. Her heart was kind and nice, and
offered help to send her students every year
to help us. As the time passed by we bought
a small piece of land. And on this land with
the help of G. V and INSA(indication) Students,well
wishers plus with my own earnings we started
constructing the building, educational hall.
Now with the help of one of the former Volunteer,
Father Warren Lowe we have constructed the dining
hall. And many types of construction works are
not yet finished,the construction is going step
by step.
On behalf of our orphan children,
we humbly appeal to the generous and kind hearted
people to extend their hands by giving donations
are any other materials needed for the building
construction. We are looking for financial assistance
for construction God is with us
|
|
|
| |
Our
Construction Works
|
| |
|
| |
Total area - (70x70) +( 70
x 70) + (10 x 10) = 10,000 square feet's.
We plan to put tiles on the floors , it will be cost IRS
30/- to IRS 50/- per square feet .
Split the works: One Room = 300 square feet. |
| |
Room for Old Aged persons |
| |
Total area - 20 x 15 = 300
square feet's. It will be cost IRS 400/-per square feet. |
| |
Dining Hall for Eating and playing: |
| |
Total area – 70 x 20
= 1400 square feet's. It will be cost IRS 300/- per square
feet. |
| |
We need another four bore wells |
| |
For Extra children bathing,cloth
washing and Drinking water. One bore well cost will be IRS
15,000 to 20,000 |
| Electrical works |
| |
One Room : (15 x 10 feet's.) 2 fan,2
tube lights, 2 bulbs,10 points.,wires,pipes etc. it will
be cost – IRS -6000/- |
|
|
| |
Painting |
| |
One Room = 150 square feet
It will be cost IRS 10/-per square feet. |
| |
Construction cupboards |
| |
Need - 150 cupboards. One
cupboard - 1.5 x 2 x 1.5 feet's. It will be cost IRS 250/- |
| |
Construction visiting hall |
| |
Size - 450 square feet (
30 x 15 ) It will be cost IRS 400/- per square feet |
| |
Construction security Room |
| |
Size - 100 square feet(10
x 10) It will be cost IRS 400/- per square feet. |
| |
Constructing Kitchen Extension |
| |
Construction going on ( Local
L&T company helping) |
| |
Repairing works Needs |
| |
1. Doors – 20 numbers
(each IRS 4000/-)
2. Windows-20 numbers(each IRS 2000/-)
3. Cement bags- 100 bags (eachIRS 170/-)
4. Sand - 4 units (IRS 1800/-per unit)
5. Bricks - 2 loads ( one load IRS6000/-)
6. Filling sand- 25 loads (one load IRS600/-)
7. Labour - 30 days (per day IRS1000/-)(6 persons)
8. Grill gates – 3 no’s (each IRS6000/-) |
| |
Common Electrical items |
| |
1. Generator, 2. water cooler,
3. Refrigerator, 4. Freezer, 5. Electrical Water Motor-2
numbers. 6. Grinder, 7. mixer 8. Washing Machine, 9. Television,
10. DVD player, 11. Amplifier 12. Mike(microphone), 13.
Speakers 14. Tape recorder, 15. Inverter, 16. Compound wall.
God is with us and we pray that he be with you too. |